Detailed Product Description
1. recover gold from the old tailings
2.the recovery can be as high as 99%
3.The cleaning up cycle is 1~4 hours
The technical specifications of STLB20 Concentrator
Feed Capacity 0~600kg/hr. (Solids)
Fluidization Water Requirement 2~3 m3/ hr.
Slurry Water Requirement 1.5~4 m3/ hr
Feed Density 0~50 % Solids/ Weight
Feed Size 0~3 mm
Concentration Cleaning Up Cycle Vein Gold 1~3 Hours. Placer Gold 2~6 Hours.
Concentrate Weight 2 kg
Power Requirements 0.75 kW
Approximate Shipping Weight 205 kg
Approximate Crated Shipping Dimensions Length 914mm x Width 700mm x Height 900mm
The technical specifications of STLB30 Concentrator
Feed Capacity 2~3tons/hr. (Solids)
Fluidization Water Requirement 3~5 m3/ hr.
Slurry Water Requirement 5~7 m3/ hr
Feed Density 0~50 % Solids/ Weight
Feed Size 0~3 mm
Concentration Cleaning Up Cycle Vein Gold 1~3 Hours. Placer Gold 2~6 Hours.
Concentrate Weight 3~5 kg
Power Requirements 1.5 kW
Approximate Shipping Weight 380 kg
Approximate Crated Shipping Dimensions Length 1160mm x Width 885mm x Height1165mm
The technical specifications of STLB60 Concentrator
Feed Capacity:8~12 tons/hr. (Solids)
Fluidization Water Requirement:7~10 m3/ hr.
Slurry Water Requirement:8~12 m3/ hr
Feed Density:0~50 % Solids/ Weight
Feed Size:0~5 mm
jaw crusher manufacturersball mill price
Concentration Cleaning Up Cycle:Vein Gold 1~3 Hours. Placer Gold 2~6 Hours.
Concentrate Weight:10~20 kg
Power Requirements:4 kW
Approximate Shipping Weight:1,110 kg
Approximate Crated Shipping Dimensions:Length 1820mm x Width 1450mm x Height1700mm